Skip to content
SOILIUM

Applications in infrastructure · 2 min read

Subsea Pipeline Sleepers on Potentially Liquefiable Sand

A subsea pipeline sleeper maintains separation at a crossing and transfers contact loads to the seabed.

A subsea pipeline sleeper maintains separation at a crossing and transfers contact loads to the seabed. Where saturated sand may liquefy, check settlement, rotation and sliding of the sleeper alongside movement and strain in both pipes. Post-event clearance can govern even if transient capacity appears adequate.

Build separate checks for the key stages

Review installation, operating, shaking and post-shaking conditions. A beam model with a bracketed range of degraded soil springs can screen pipe response. Check seabed resistance and reconsolidation separately using suitable site-specific models. Evaluate differential support and scour in addition to liquefaction. Maintain explicit contact assumptions between each pipe, the sleeper and the ground.

Illustrative clearance check after reconsolidation

Suppose the initial vertical clearance between the pipes is 250 mm. At the crossing point the upper pipe moves down 80 mm and the lower pipe moves down 20 mm. With unchanged external pipe envelopes and no rotation effects beyond the stated displacements, the remaining vertical clearance is 190 mm. For an actual assessment, check the closest points along both pipes, allowing for sleeper rotation, changes in support, protective coatings and the applicable clearance requirement. Review bending and contact together because the geometry that controls clearance may differ from that governing maximum pipe strain.

Why check the lower pipe directly?

Sleeper rotation, changed support and seabed movement can affect the lower pipe’s clearance and strain. Check its operating and post-event configurations.

References

Related articles